News

Yuanjing Energy wins a large order of 600000 kW wind power hybrid tower from Huaneng

2024-06-18

Source: North Star Wind Power Grid


On April 7th, Huaneng International Engineering Company announced the procurement results of wind turbines for the 600000 kilowatt EPC project of Ordos Phase II Warm Water Wind Power. Yuanjing Energy won the bid with a bid price of 912 million yuan.

 

Project Overview: This project is located in Zhungeer Banner, Ordos City, Inner Mongolia Autonomous Region, with an elevation range of 1140m to 1550m. It is planned to construct a 600MW wind power project and install 96 wind turbines with a single capacity of 6.25MW (impeller diameter of 200m, center height of the hybrid tower hub of 160m). At the same time, a 220kV booster station, energy storage system, and supporting 220kV transmission lines will be built.



WordPress Video Lightbox Plugin
诏安县| 西安市| 北碚区| 镇安县| 龙江县| 望奎县| 乌苏市| 望江县| 海林市| 成安县| 那坡县| 南岸区| 隆化县| 徐闻县| 留坝县| 玛纳斯县| 泉州市| 乐清市| 永年县| 邓州市| 宜兰县| 临沧市| 漠河县| 威宁| 莆田市| 滨州市| 德令哈市| 柘城县| 应用必备| 海伦市| 扬州市| 长乐市| 濉溪县| 海盐县| 葫芦岛市| 新龙县| 平原县| 共和县| 大港区| 鱼台县| 蒲城县|